Business to Business - Vermont Department of Economic Development_ThinkVermont.com_
_ Home _
To print, go to File on the menu bar and select Print.

Journeys End Erosion Control and Reconstruction Project Request Date: 2/27/2025 6:42:48 PM
Open Date: 2/27/2025
Closing Date: 3/18/2025 10:00 AM
Intent To Bid Deadline: 
Est. Dollar Value: $0.00
RFQ Number: 2025
Close Window

Town of Mendon

2282 US Route 4
MendonVT 05701

Bid Type:
Job Contract

Locations:
Rutland
Keywords:
Construction (Non Building), Culvert Replacement, Road Construction

Bid Description:
Bids from qualified contractors will be accepted until 10:00 am on March 18, 2025, at the Mendon Town Garage at 157 Park Lane, Mendon, VT 05701. Bids will be opened on March 18th at 10:30 am in the order that they are received. Bids can be hand delivered, emailed or mailed to be received before the deadline. Please title the bid “Journeys End Erosion Control and Reconstruction Project”. The project is located on Journeys End in Mendon at the end of the pavement to the end of the road and intersection of 5 driveways, approximate project length .22 miles. The installation of erosion control measures is phase A of the project and is partially funded by a Better Roads Program Grant. Expenses must be kept separate and submitted in accordance with the grant requirements. The scope of work of phase A will include excavation and installation of catch basin, cross culvert, driveway culverts, subbase gravel, excavate rock lined ditch & establish grass lined ditch, traffic control, seed, topsoil, mulch, mobilization and demobilization of material and equipment. Phase B will consist of reconstruction of the roadway to include excavation, installation and compaction of roadbed state spec material and paving. The VAOT 2011 Standard Specifications for construction as modified shall apply. All Federal, State and local laws apply. All construction will be in accordance with the Town of Mendon Highway Specifications Class 3 Roadway, the Agency of Transportation Standard D-33 and the Municipal Roads General Permit. The final surface pavement will be applied at 2.5” base course of HMA Type II and 1.5” top of HMA Type IV compacted. Traffic Control must be in accordance with the 2009 MUTCD. The road must maintain access during construction. Bidder agrees to start work under this contract after the Notice to Proceed has issued and that the Final Completion of the construction project is June 13, 2025.

Special Instructions:
For full set of Bid documents go to: https://www.mendonvt.gov/town-opportunities/requests-for-bids/ Chris Baird, Road Commissioner, 802-770-2169 Please contact Chris if you have questions about the project.
Awardees